Pneumatics Engineer

Aplicanţi: 1

• Including calculation and design of piping or tubing connections for compressed air and cooling water pipe
• Determination of total media consumption
• Compressed air
• Cooling water
• gases
• Interpretation of the necessary flue gas extraction, including determination of all possible emissions
• Creation of Pneumatic scheme Hydraulic scheme Cooling Scheme piping scheme and associated parts lists based on components overviews and process descriptions (from design department)
• Development of a TMS project standards, inter alia, with the following stipulations:
-Definition of the installation material
-Definition of the devices (VI, ...)
-material where-used List / Material Release List
-Execution policy on device installation
-Execution policy for parent fluid
-Creation of quantity structure
-HIPs, RIPs (field supply) ...
• Preparation of technical specifications based on customer requirements
• Technical clarification internally and externally with customers or suppliers
• Awarding contracts to partner companies in cooperation with TMS purchasing
• Order processing in coordination with clients, internal mounting outdoor installation and partner companies to final acceptance by the end customer
• Check if there are significant deviations from the sales stall> Cooperation with NT management
• Creation of fluid-technical documentation